Projects
AG Coombs
Mechanical Services Expansion for two ANZ Data Centres - $ 900k
Virgin T1 VIP Lounge Mechanical Upgrade - $ 200k
ME5 Data Centre Chiller Plant Upgrade - $500k
Collins Place Air Handling Units Upgrade $800k
ASA Data Centre Construction Melbourne & Brisbane Sites - $3.2m
Australian Prime Property Fund Commercial
485 Latrobe Street new Generator System - $1m
Coles
Data Centre upgrade works $1.5m
Datacom Group
Data Centre Upgrade - $ 1.2m
New Data Centre Fit-out - $2m
Downer Engineering
ANZ BANKING GROUP - DATA Centre
Switchboard Upgrade Project - $400k
High Density Cooling Plant - $2m
House Power Upgrades to Data Centre $200k
TPG Telecom
Data Centre infrastructure upgrade - $40k
New Mains Supply - $1.2m
Split metering and upgrade SB - $161k
Generator Works on all locations - $60k
JLL P&DS
Floor Refurbishment at 75 Dorcas St - $300k
Kitchen & Amenities Upgrade at 75 Dorcas St - $95k
Lower Ground Floor Refurbishment at 55 Collins St - $500k
Fourteen floor refurbishment at 55 Collins St - $3m
UPS supply upgrade works at 55 Collins St - $1m
McCormack Property Services
Main Switchboard Replacement – 330 Collins Street, Melbourne - $2.7m
The Trust Company
Replacement of 2 Mains Switchboards and the Public Rising Mains from Basement through to Level 21 at 200 Queen Street - $1.4m
VOCUS Communications
Data Centre Upgrade; New Main Switchboard and Genset - $700k
Vicinity Centres
Building Electrical and automation Services since 2018:
Sofitel Chadstone
Emporium
Chadstone Shopping Centre
All Staff Air Conditioning
Mechanical Chiller Upgrade for ANZ Data Centre - $ 110k
Mechanical upgrade ME5 Data Centre - $200k
AMP/TTT/ANZ
Collins Place Electrical refurbishment projects $25mil + – onsite since 2014
Rising Mains replacement
Communications Rooms upgrade
Generator Controls Replacement
Main switchboards replacement
Mechanical Plant – Generator PLC Upgrade
Mechanical Plant - VSD Upgrades
Sofitel Tenancy works
Public and Tenant Distribution Board Replacement
ANZ Mech Boards
AWS (Amazon Web Services)
Installation of site HV equipment & controls gear - $240k
Installation of site EPMS - $90k
Installation of site Eaton UPS systems - $70k
Site Commissioning of all SMBE switchboards - $200k
Site ICA along site CommTech Asia - $30k
Erilyan
COLO 4 Upgrade (A4 TRX, Generator, UPS, COLO Installation) – Lorimer Street - Port Melbourne - $3m
5 New ‘Munters’ to AHU 3 & AHU 4 – Lorimer Street – Port Melbourne - $500k
Stage 1P, A3 untethering works, Mech Plant Installation – Lorimer Street – Port Melbourne - $1.2mil
Stage 2, A5 TRX, Generator, UPS, Mech Plant Installation, COLO 1.1 – Lorimer Street – Port Melbourne - $4.9 m
GPT Group
Carpark and Foyer upgrade work at 530 Collins St - $ 1.3 m
Lend Lease
Replacement of 8 existing Generators with 3 x 2.5 MW Generators all synchronizing and connected to a new 6000AMP GDB, supporting a major Data Centre - $2.4m
Shape Group
Infrastructure Alteration, DAS works and removal – Salmon Street, Port Melbourne -
$1.4milNBN – Port Melbourne Generator and control upgrade - $700k
NBN
PQM installations throughout various Australian sites - $1.4m
BSA
Telstra Site upgrade works
Cushman and Wakefield
Westpac - 150 Collins St